1. Before the hydraulic components are installed, they should be cleaned with kerosene. The important components should be sealed and pressure tested. The test pressure can be twice the working pressure or 1.5 times the highest working pressure. The test should be carried out in stages. Do not rise directly to the test pressure and check once every liter.
2, the directional control valve should ensure that the axis is installed in a horizontal position.
3. When installing high-speed dispersing plate components, check whether the sealing ring at the inlet and outlet is suitable. Before installation, the sealing ring should protrude from the mounting plane to ensure a certain amount of compression after installation to prevent leakage.
4. When the plate component is installed, the tightening force of the set screw should be uniform, so that the mounting plane of the component can be in good contact with the plane of the component bottom plate.
Related Industry Knowledge
- Mixer power conditions
- Mixer Setup
- Mixer adjustment
- Mixer maintenance
- Mixer works
- Blender by job classification
- Ever mixer
- Mixer device classification
- Mixer according to the discharge pattern classi...
- Mixer shape classification
- How to install the small high-speed disperser s...
- What are the installation principles for hydrau...
- Disassembly of high-speed disperser hydraulic c...
- High speed disperser bolt removal method
- Small high-speed dispersing machine maintenance...
- High-speed disperser hydraulic system loop anal...
- How to disassemble the oil supply pipe of the s...
- Preparation method of ultrafine zinc oxide - we...
- Horizontal sand mill for dispersion and grindin...
- Silver paste preparation method--sand mill